The Committee of Adjustment is where a Toronto homeowner goes when a design breaks a zoning rule by a small amount: a house a little taller than the by-law allows, a rear wall a little deeper, a side yard a little narrower. The Committee can approve that exception, called a minor variance, after a public hearing. In 2026 the application fee for a new house or a multiplex of up to three units is $5,011.08, and an addition or alteration to an existing house is $2,228.98.

This guide explains when you need the Committee, how it decides, what the process looks like from application to final decision, and how to give an application the best chance.

When you need the Committee of Adjustment in Toronto

Every lot in Toronto has a zoning label that sets the limits: height, building depth, setbacks, lot coverage and, in many zones, floor area. If your plans meet every limit, you go straight to a building permit. If they don’t, you have three options:

  1. Change the design so it complies
  2. Apply to the Committee of Adjustment for a minor variance
  3. For larger changes, apply to rezone the property (a much longer process)

Most custom homes, additions, multiplexes and garden suites that need relief go the second route. Common variances on Toronto houses include building height, main wall height, building depth and length, side yard setbacks, floor space index and, on smaller lots, lot coverage.

The Committee also hears consent applications, which are requests to sever a lot or adjust a lot line. Those follow similar steps but are not covered here.

How the Committee of Adjustment decides: the four tests

Section 45(1) of Ontario’s Planning Act sets the test. A variance can be approved only if, in the Committee’s opinion, it:

  1. Maintains the general intent and purpose of the Official Plan
  2. Maintains the general intent and purpose of the zoning by-law
  3. Is desirable for the appropriate development or use of the land
  4. Is minor

All four have to be met. “Minor” is not a percentage. The Committee looks at the impact of the variance on the street and the neighbours: shadow, overlook, massing, and whether the result fits the physical character of the area. A 0.5 m height variance on a street of tall houses can be minor; the same variance next to a row of bungalows may not be.

City planning staff and other departments may comment on the application, and neighbours can write in or speak at the hearing. The Committee weighs all of it, but it decides.

Three-storey infill building under construction behind Khales Corporation site hoarding on a Toronto street

Committee of Adjustment fees in Toronto (2026)

Application Fee (effective 1 January 2026)
Minor variance: additions and alterations to existing dwellings with three units or less $2,228.98
Minor variance: residential dwellings with three units or less (new builds) $5,011.08
Minor variance: all other residential, commercial, industrial or institutional uses $6,485.59
After-the-fact variance (work already built without approval) Double the regular fee

Source: City of Toronto, Committee of Adjustment fees effective 1 January 2026. Fees change every January.

Budget separately for the professional work behind the application: survey, drawings, a planning opinion where the variances are significant, and an arborist report if trees are affected.

The minor variance process in Toronto, step by step

1. Zoning review first. Before applying, have Toronto Building review the drawings, through a Zoning Applicable Law Certificate or a zoning review. This produces the list of exactly which regulations the design does not meet. An application that misses a variance can be approved and still leave you unable to get a permit.

2. Pre-consultation and neighbours. Talking to City planning staff early, and to the immediate neighbours before the notice goes out, changes outcomes. Most objections come from people who first hear about a project from a notice in their mailbox.

3. Application. As of November 2026, applications are submitted by email to the City, using the 2026 Form A and Form B (effective 1 October 2026), with drawings, the zoning review, the fee and supporting reports. The district office (Toronto and East York, North York, Scarborough, Etobicoke York) handles the file.

4. Circulation and notice. The City circulates the application to departments and mails a notice of hearing to nearby owners. A sign is posted on the property.

5. Hearing. Hearings are held in a hybrid format, in person and online. The applicant or their agent presents, the Committee asks questions, and anyone who registered can speak. The Committee can approve, approve with conditions, refuse, or defer the application so the design can be revised.

6. Decision and appeal period. The written decision is issued, and the appeal period runs for 20 days. If no one appeals, the decision is final and binding.

7. Building permit. With a final decision, the building permit application can go ahead, meeting any conditions the Committee set.

How long the Committee of Adjustment takes

The City’s own business standard is 60 days for a minor variance, but a June 2025 City report noted that average timelines in most districts remain well above that. In practice, plan for several months from a complete application to a final decision, and longer if the hearing is deferred or the decision is appealed. The zoning review and drawings before the application add time at the front.

That is why the variance decision belongs at the start of a project schedule, not in the middle of it.

Appealing a Committee of Adjustment decision: the Toronto Local Appeal Body

In Toronto, minor variance appeals go to the Toronto Local Appeal Body (TLAB), not the Ontario Land Tribunal, which hears the matter fresh. Since Ontario’s 2022 housing legislation (Bill 23), third-party appeal rights for minor variances have been narrowed: the applicant, the City and certain public bodies can appeal, but neighbours generally can no longer take a variance decision to appeal. Their say comes at the Committee hearing itself.

If an application is refused, the owner can appeal to TLAB within the appeal period, or revise the design so it needs fewer or smaller variances and apply again.

How to improve your chances at the Committee of Adjustment

  • Ask only for what the design needs. Every variance has to be defended. A design that trims an extra 30 cm to remove one variance is often worth it.
  • Show the street. Context drawings and photos of comparable houses nearby help the Committee judge “minor” and “appropriate”.
  • Solve the neighbour’s real concern. Privacy screens, obscured glass, moving a window or stepping back a third floor can turn an objection into a letter of support.
  • Look at past decisions on your street. Committee decisions are public. What was approved and refused nearby is the best guide to what will pass.
  • Bring a complete file. Incomplete applications are not scheduled, and deferrals at the hearing cost weeks.
  • Keep the trees in view. A design that affects a protected tree needs the tree permit process to line up with the variance, or the approval can stall later.

Committee of Adjustment Toronto: FAQs

What is a minor variance in Toronto?
A minor variance is permission from the Committee of Adjustment to depart slightly from a zoning rule, such as height or setback, without rezoning the property. It is granted only if the four tests in the Planning Act are met.

How much does a minor variance cost in Toronto?
As of 2026, the City’s fee is $2,228.98 for additions and alterations to existing dwellings with three units or less, and $5,011.08 for new residential dwellings with three units or less. Drawings, surveys and consultant reports are extra.

Can my neighbour stop my minor variance?
A neighbour can object in writing or at the hearing, and the Committee considers those comments. Since 2022, neighbours generally cannot appeal the Committee’s decision to TLAB.

Do I need the Committee of Adjustment for a multiplex or garden suite?
Only if the design does not meet the zoning. Many multiplexes and garden suites go straight to a building permit because the zoning already permits them.

What happens after the Committee approves my variance?
The decision becomes final after the 20-day appeal period if no one appeals. You can then apply for the building permit and must meet any conditions in the decision.

Need a minor variance for your project?

Khales Corp is a Toronto and GTA design-build company licensed by the HCRA (licence 61246). We prepare the zoning review, the drawings and the Committee of Adjustment application, and we design to keep the list of variances short. See how the approvals fit into building a custom home in Toronto, step by step, or start with a lot feasibility review. For multiplex projects, see multiplex construction in Toronto. The City’s Committee of Adjustment page lists hearing schedules by district.

author-avatar

About Khales Expert

Khales Expert writes the guides on khales.build for Khales Corp, a Toronto and GTA design-build general contractor licensed by the Home Construction Regulatory Authority (HCRA licence 61246). The guides cover custom and modern homes, multiplexes, laneway houses and garden suites, and dental and medical clinic construction in Toronto and the GTA, with rules and figures dated and taken from official sources.