Home Additions in Toronto

Khales Corp is a North York design-build company, established in 2003, that builds additions to existing Toronto homes: up, behind or beside the house. Every addition starts with what the zoning allows on the lot, then drawings, permits and construction run under one contract.

What we build

Home additions in Toronto: what we build

An addition adds new space to the house you already have. Each type runs into a different part of the zoning, so the type of addition is settled with the lot review.

Why Khales

Why Khales for custom home additions in Toronto

An addition is new construction tied into an old house. Khales builds both, so the new structure and the existing one are planned by the same team.

The zoning is checked first

Height, depth, setbacks and coverage decide what kind of addition the lot can take, before anything is drawn.

New-build experience

Khales builds custom homes as well as additions, so foundations, framing and building systems for the new space are handled by a team that builds whole houses.

Variances handled in-house

The team that prepares the drawings also manages the applications and the coordination with the City, and has experience with City of Toronto permits and the Committee of Adjustment.

Budget with the drawings

Costs are developed alongside the design, so the size of the addition is tested against the budget before the permit drawings are done.

Licensed by HCRA

Khales is licensed by the Home Construction Regulatory Authority, licence 61246. Our Google rating is 5.0.

Zoning rules

Second storey and house addition rules in Toronto

As of November 2026, an addition has to fit the same zoning limits as the house it is added to, under Zoning By-law 569-2013. The limits for a specific lot come from its zone label and the City’s overlay maps.

Height. The Height Overlay Map sets the maximum height for an area, and in some areas the maximum number of storeys, for example “HT 9.0” or “HT 11.0, ST 2”. A second storey addition has to stay inside both.

Main wall height. Separate from overall height, the zoning limits how high the main walls can go. As of November 2026, in the RD (residential detached) zone, a detached house with a pitched roof can have its main walls rise to the higher of 7.0 m above established grade or 2.5 m below the permitted maximum height. The limit applies either to the side walls for most of their width or to the front and rear walls for a set share of their width, which depends on lot frontage. A house with a flat or shallow roof follows a separate rule of 7.2 m. This is often the limit a second storey meets first.

Building depth. Each zone sets a maximum building depth, and some set a maximum building length. A rear addition that pushes the back wall past it needs a variance.

Setbacks. The front, rear and side yard setbacks set how close the house can come to each lot line. Side yard setbacks depend on the zone and the lot frontage. In the R zone, for example, the minimum side yard setback for a detached house is 0.9 m.

Lot coverage. The Lot Coverage Overlay Map sets the share of the lot that buildings can cover, shown as a percentage such as “40” or “45”. A rear or side addition adds to the footprint and counts against it.

Permits. A second or third storey addition, and any other addition, needs a building permit. If the work would injure or remove a private tree with a trunk diameter of 30 cm or more, a tree permit is needed too.

Committee of Adjustment

When a house addition goes to the Committee of Adjustment

When an addition largely complies with the zoning but not quite, the owner applies to the Committee of Adjustment for a minor variance before the building permit. As of November 2026, the Committee applies four tests set by the Planning Act. Each variance has to:

01

Be minor in both size and impact. The Committee looks at effects such as privacy and shadow on neighbouring properties.

02

Be desirable for the appropriate development or use of the land.

03

Maintain the general intent of the zoning by-law.

04

Maintain the general intent of the Official Plan, including respect for the character of the neighbourhood.

The variances have to meet the tests individually and together. Typical addition variances are for main wall height, building depth, side yard setbacks and lot coverage, so the design decides early which of these it needs and how far it goes past each limit.

Process

Our home addition process

01

Lot and house review: what the zoning allows for an addition, and how the existing house is built.

02

Design: the addition’s size, layout and connection to the existing house, with the budget developed alongside.

03

Committee of Adjustment, if the design needs variances.

04

Permits: the building permit, and tree permits where protected trees are affected.

05

Construction: foundations, structure, envelope and building systems for the new space, tied into the existing house, run by one site lead with scheduled milestones.

06

Millwork, landscaping and handover.

Questions

Home additions FAQs: Toronto

Can I add a second storey to my house in Toronto?

It depends on the height, main wall height and storey limits for your lot. As of November 2026, these come from the zoning by-law and the Height Overlay Map. A design that goes past them can apply to the Committee of Adjustment for a minor variance.

As big as the building depth, rear yard setback and lot coverage limits for your lot allow. A design that goes past any of them needs a minor variance first.

Yes. As of November 2026, Toronto Building lists second and third storey additions, and additions generally, as work that needs a building permit.

Whether each variance is minor in size and impact, desirable for the appropriate use of the land, and in keeping with the general intent of the zoning by-law and the Official Plan. Effects on neighbours, such as privacy and shadow, are part of the minor test.

Yes. Khales is a design-build company: architecture, interiors and construction are handled by one team under one contract.

Talk to us about a home addition in Toronto

Send us the address and what you want to add, and we’ll start with what the zoning allows on your lot.

We use what you send only to answer your enquiry. See our privacy policy.